The cost of regulatory delay: quantifying how permitting timelines affect offshore wind energy costs
Rudolph Santarromana, Ahmed Abdulla, M Granger Morgan, Joana Mendonça
Key points
From the paper's conclusion- The results show that for an example, one gigawatt plant, deploying one year sooner can save €110 million—a relevant metric to gauge the cost of policy designed to expedite deployment.
Abstract
Rapid deployment of offshore renewable energy and transmission infrastructure can be a major contributor to energy system decarbonization. However, regulatory obligations frequently impose deployment delays that are typically not quantified in cost terms. The costs of such delays should be incorporated in project and technology assessments. Here, a framework is developed that treats the development lag between project inception and operation as a temporal proxy for regulatory and related obligations, and propagates it through a levelized-cost-of-energy calculation to quantify the cost of delay. This framework is used to compare, on a common basis, conventional high-voltage cable transmission with offshore power-to-hydrogen (PtH) alternatives. The framework is applied to three strategies to move energy to shore from offshore wind facilities. The results show that for an example, one gigawatt plant, deploying one year sooner can save €110 million—a relevant metric to gauge the cost of policy designed to expedite deployment. In scenarios where the PtH can be deployed faster than high-voltage cables, the results suggest a limited decision space in which PtH transmission is cheaper, indicating that it will need to realize other benefits to compete with high-voltage cable transmission on cost. Profitability between electricity-based and hydrogen-based transmission is then compared, considering differences in deployment time. There are existing conditions of hydrogen and electricity prices that indicate PtH pathways may be more profitable when a difference in deployment lag is applied. In the example considered here, a lag difference can result in a greater number of exploratory price scenarios where PtH is more profitable. This framework is useful to quantify the implications of regulatory obligations and tune policies to accelerate low-carbon energy deployment.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Multi-Objective Optimal Sizing and Energy Management of Offshore Wind-Powered Green Hydrogen Plants: Pareto Trade-Offs Between Levelized Cost of Hydrogen, Electrolyzer Degradation, and Wind CurtailmentInternational Journal of Innovative Research in Engineering · 2026
- Multi-Dimensional and Systemic Review of the Offshore Wind–Hydrogen Energy Megaprojects Risks: A Systematic Review with Integrated Risk TaxonomyEnergy Storage and Applications · 2026
- Corridor-based optimization of offshore wind for industrial hydrogen and ammonia supplyEngineering Science and Technology an International Journal · 2026
- From wind to hydrogen: mapping the competitiveness of hybrid offshore configurations in the Mediterranean SeaFrontiers in Energy Research · 2026
- The impact of electrolyser allocation on Great Britain's electricity transmission system in 2050International Journal of Hydrogen Energy · 2025
- A method for spatially resolved techno-economic assessment of offshore wind-to-hydrogen systems: A northern Adriatic Sea case studyEnergy Conversion and Management · 2025