Orbit-Constrained Complete Activity Chain Planning and Fault Replanning for Deep-Space Missions
Hao Xu, Zhe Zhang, Xintao Zhao, Shuangliang Liu, Mengjie Shi, Chen Tang, Qi Chen, Maodeng Li
Key points
From the paper's conclusion- A deterministic generator expands each goal into a complete activity chain, and an independent verifier replays the candidate timeline to check precedence, state transitions, window containment, mutual exclusion, and resource propagation.
Abstract
Deep-space mission planning must coordinate orbit-derived geometry windows, attitude maneuvers, activity sequencing, and limited energy and storage. Checking only whether a core task lies within a window can produce candidate plans whose preparation, execution, and closeout activities cannot be completed. This paper presents an orbit-constrained complete activity-chain planning and fault-replanning method for deep-space mission concept studies. Time-tagged orbital states and relative geometry are converted into science-observation windows, Earth-communication geometry windows, Sun angle, pointing separation, and dynamic slew time. A deterministic generator expands each goal into a complete activity chain, and an independent verifier replays the candidate timeline to check precedence, state transitions, window containment, mutual exclusion, and resource propagation. After low-energy events, slew timeouts, or communication-window loss, replanning inherits the actual fault-time state and remaining resources and uses only future valid windows. In nominal experiments, the complete configuration eliminates false acceptances and increases verified science value by selecting a feasible high-value goal combination. In all three fault scenarios, it avoids energy, window, and failed-window-use violations and gives explicit rejection reasons when recovery is unavailable. The method supports consistent plan design and executability assessment during deep-space mission concept studies.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Trustworthy agentic lunar robotics: safety-constrained contingent planning with a foundation-model plannerarXiv · 2026
- OrbitTAMP: Grounding Language Models for Task and Motion Planning in Spacecraft RendezvousarXiv · 2026
- Chance-Constrained Inspection Viewpoint Sequencing for On-Orbit Servicing via Safe Reinforcement LearningarXiv · 2026
- Mission Planning for Multi-Spacecraft Relay Observation Based on Hungarian AlgorithmAerospace · 2026
- Generalized Framework for Cislunar Satellite Placement and Operations OptimizationThe Journal of the Astronautical Sciences · 2026
- Research on a Spacecraft Mission Planning Architecture Based on Retrieval-Augmented GenerationJournal of Physics: Conference Series · 2026