On-orbit Autonomous Multi-Satellite Collaborative Task Planning
Dong Zhaoyong, Xu Rong, Xi Chongbing, Wang MoYang, Wang JiaWen
Key points
From the paper's conclusion- The proposed method provides a viable task planning solution for the autonomous on-orbit operation of space-based space debris tracking systems.
Abstract
To address the challenge of real-time task planning for multi-satellite cooperative observation in space debris tracking missions, a multi-satellite cooperative task planning method is proposed for autonomous on-orbit operation. The method adopts a “centralized planning–distributed execution” cooperative architecture and implements a four-layer algorithmic framework consisting of resource filtering, target prioritization, multi-target allocation, and state monitoring & replanning. At the resource filtering layer, infeasible observation resources are eliminated by considering energy, payload, communication, storage, and visibility constraints. At the target prioritization layer, the analytic hierarchy process (AHP) is employed to quantify target priorities by fusing collision risk, target size, localization uncertainty, and observability indicators. At the multi-target allocation layer, a rolling horizon adaptive heuristic algorithm is utilized at the tracking-satellite level for local approximate optimization, while an improved Kuhn-Munkres (KM) algorithm is applied at the fusion-satellite level to achieve global optimal assignment, balancing computational efficiency and allocation quality through two-level coordination. At the replanning layer, a two-level response mechanism consisting of local rolling replanning and global replanning is designed to handle dynamic events such as satellite failures and sudden emergency threats. Simulation results demonstrate that in a tracking mission involving a 24-satellite heterogeneous constellation and 30 space debris targets, the cooperative planning mode achieves a target coverage rate of 86.7%, which is about 10% points higher than that of the independent planning mode. The response times for routine planning, local replanning, and global replanning are 0.42 s, 0.51 s, and 2.87 s, respectively, all meeting the on-orbit real-time constraint (<5 s). The proposed method provides a viable task planning solution for the autonomous on-orbit operation of space-based space debris tracking systems.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Mission Planning for Multi-Spacecraft Relay Observation Based on Hungarian AlgorithmAerospace · 2026
- Large-scale emergency remote sensing task re-planning based on hierarchical objectives and large neighborhood search algorithmJournal of Physics: Conference Series · 2026
- Hierarchical Decision-Making Method for Swarm-to-Swarm Orbital Pursuit–Evasion GamesAerospace · 2026
- An Adaptive Hierarchical Multi-Objective Optimization Framework for Satellite Constellation Reconfiguration under Multi-Satellite FailuresJournal of Physics: Conference Series · 2026
- A Topology-Aware Quantum-Classical Framework for Multi-Target Active Debris Removal using Gaussian Boson SamplingarXiv · 2026
- A schedule-repair-enhanced two-stage method for multi-satellite earth observation task schedulingJournal of Physics: Conference Series · 2026