Journal of Physics: Conference Series

A Factor-Graph Framework for LEO Doppler Navigation under Serial Observation Topology with Explicit Handover Modelling

Shuai Wang, Xuebin Zhuang, Xuyue Ren, Hongchen Liu, YiDi Yu, Pingnan Deng, Lu Cao, Xianyang Liu,

Key points

From the paper's conclusion
  • We formulate Doppler-only navigation for low-dynamic users under this serial observation topology as a factor-graph (FG) maximum-a-posteriori problem with four factor types: prior, constant-velocity motion, Doppler, and a handover-specific switch factor that enforces a velocity and clock-drift continuity prior at satellite-change epochs of an online sliding-window estimator.

Abstract

Narrow-beam Low Earth Orbit (LEO) constellations such as Iridium NEXT assign only one satellite to a user at each epoch; geometric diversity therefore accumulates across satellite handovers rather than across simultaneously visible spacecraft. We formulate Doppler-only navigation for low-dynamic users under this serial observation topology as a factor-graph (FG) maximum-a-posteriori problem with four factor types: prior, constant-velocity motion, Doppler, and a handover-specific switch factor that enforces a velocity and clock-drift continuity prior at satellite-change epochs of an online sliding-window estimator. The minimum eigenvalue λ min (in m −2 ) of the position Fisher Information Matrix (FIM) is adopted as a geometric observability metric for satellite scheduling. Monte Carlo experiments over an Iridium-like geometry yield a steady-state velocity root-mean-square error (RMSE) of 0.42 ms −1 for the batch FG estimator, against 1.71 ms −1 for an Extended Kalman Filter (EKF) with covariance inflation. In the sliding-window setting, the switch factor reduces the handover peak position error by 66.4%. Both periodic and information-greedy scheduling clearly outperform single-satellite observation, and the FG-Batch velocity normalised estimation error squared (NEES) lies within its 95% acceptance interval, indicating that the Hessian-based covariance estimate is statistically consistent within the simulated regime.

Read the paper

Discussion

Science Skim's AI key points, plus readers' public thoughts

Readers' thoughts

No reader thoughts yet.

Related papers