TMR Optimization for the Upgrade Plan of the LvB Compact Accelerator-Based Neutron Source
Mina Akhyani, Ha Shuai, Ferenc Mezei
Key points
From the paper's conclusion- This study demonstrates a practical methodology for assessing and improving the performance of multi-instrument compact neutron sources.
Abstract
The LvB 1 project, the first compact accelerator-based neutron source (CANS) in Central Europe, is being developed by Mirrotron Ltd. and the HUN-REN Centre for Energy Research to support industrial applications originally, such as reflectometry and diffraction. A second target station being built by Mirrotron Ltd. is optimized to provide epithermal neutron beams for the study of boron neutron capture therapy related experiments. Currently, LvB is ready to operate with a 2.5 MeV pulsed proton beam on a lithium target at a time-average current of 1 mA. A potential upgrade option is to further increase the proton energy to 8 MeV to increase the neutron brightness. Monte Carlo simulations (PHITS) are used to optimize the target-modulator-reflector assembly to estimate potential brightness gains and evaluate the feasibility of the upgrade. Brightify is used to calculate the trade-off scenarios for the arrangement of the two instruments. This study demonstrates a practical methodology for assessing and improving the performance of multi-instrument compact neutron sources.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- A Novel Multi-Target Approach for simultaneous enhancement of brightness, intensity, and bi-spectral performance of cold neutron sourcesarXiv · 2026
- Neutronics Calculations for the SNS Second Target Station Target and Moderator Final DesignJournal of Physics: Conference Series · 2026
- Conceptual Development of a Target Station and Target Exchange Process for Accelerator-Based Molybdenum-99 ProductionJournal of Physics: Conference Series · 2026
- Benchmarking Monte Carlo codes for the modelling of low-energy neutron production target reactionsComputer Physics Communications · 2025
- Development of an online neutron beam monitoring method for accelerator-based BNCT using an 8-MeV proton-beryllium source.Medical physics · 2026
- Dosimetry foil characterisation of a new lithium-target fast neutron sourceFusion Engineering and Design · 2026