Manufacturing Review

Artificial intelligence-assisted event-contract coordination prototype for fused deposition modelling equipment manufacturing: public-data and digital-shadow evaluation

Jing Li, Yanqi Zhang, Kangrui Xu, Zhenggao Pan, Shuhao Shen

Key points

From the paper's conclusion
  • We built an event-contract prototype connecting orders, materials, assembly, quality and equipment condition through 14 entities, 16 event types, four state protections and a seven-state approval gate.

Abstract

AI forecasts and defect classifiers do not automatically translate into approved actions in fused deposition modelling (FDM) equipment manufacturing. We built an event-contract prototype connecting orders, materials, assembly, quality and equipment condition through 14 entities, 16 event types, four state protections and a seven-state approval gate. Five independent public datasets supported module tests; synthetic fault injection tested state protection; and an offline digital shadow compared policies. All 32 deterministic contract tests met expected outcomes, and the complete contract reproduced expected technical and business states in 100/100 randomized runs. Across 100 paired seeds, the complete policy shortened mean cycle time by 0.966 days and improved on-time delivery by 0.228 percentage points against an upper-quantile, earliest-due-date baseline. Inventory cost increased by 0.234 scenario units per order, while equalizing maintenance durations removed service and downtime differences. These scenario-dependent results support an auditable prototype, while enterprise deployment and operational benefits remain unvalidated.

Read the paper

Discussion

Science Skim's AI key points, plus readers' public thoughts

Readers' thoughts

No reader thoughts yet.

Related papers