The impact of terms of payment optimization on project cash flow performance: A contracting strategy approach in gasoline tank construction projects
Adi Kurnia Muktabar, Danu Bratakusuma, Yusuf Zaelana, Audithira Mahardriasmoko, Suprianta Setiawan Putra, Juanto Sitorus, Grace Natalia Sitorus, Henty Wyatno
Key points
From the paper's conclusion- This paper discusses a case study to examine the impact of Terms of Payment (ToP) optimization as a contracting strategy on project cash flow and delivery performance in a gasoline storage tank restoration project, following a 2021 refinery fire that damaged the previous tanks and reduced operating capacity.
Abstract
This paper discusses a case study to examine the impact of Terms of Payment (ToP) optimization as a contracting strategy on project cash flow and delivery performance in a gasoline storage tank restoration project, following a 2021 refinery fire that damaged the previous tanks and reduced operating capacity. A Plan-Do-Check-Action (PDCA) approach was applied using Quality, Cost, Delivery, Safety, and Morale (QCDSM) indicators, then risk assessment, root cause analysis, and Pareto analysis were used to identify the dominant causes of cash flow constraints. Forecast cash flow profiles before and after the intervention were compared for a deeper understanding of the contractor's liquidity condition. It was found that sequential cash retention created a forecast peak negative cash flow of 27.32% of contract value, which increased liquidity pressure on the contractor and could affect subcontractor and supplier payments. Therefore, the cash retention was replaced with a bank guarantee through a contract amendment, so that the peak negative cash flow was reduced to 3.58% of contract value. The result showed that the improved liquidity and resource readiness contributed to project completion 15 calendar days ahead of schedule, generating verified value creation of approximately USD 16.8 million. Furthermore, the proposed contracting strategy in this work can be used as a reference for mitigating contractor cash flow constraints in tank construction projects due to the limited empirical studies on ToP optimization as a contractual strategy during project execution.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Implementing Lean Construction Principles in Civil Infrastructure Projects: An Analytical Framework for Productivity Enhancement and Waste EliminationBuildings · 2026
- Evaluación del impacto de la gestión del flujo de caja en el cumplimiento del iva e impuesto a la renta en empresas constructoras: caso Kallpa constructora.Innova Science Journal · 2026
- Linking computerised accounting information systems to innovation, resilience and performance in construction projectsEngineering Construction & Architectural Management · 2026
- Developing Lean Analytics Matrices For Sri Lankan Large Contractor Risk Management PerformanceIOP Conference Series: Earth and Environmental Science · 2026
- Simulation-Based Strategy Valuation Under Uncertainty: Risk Aggregation and Liquidity Constraints in a Manufacturing SMEJournal of Risk and Financial Management · 2026
- Knowledge-Driven Claim Governance: A Checklist of Entitlements and Procedures in FIDIC and National Standard ContractsBuildings · 2025