Research on Precise Earthwork Balancing and Vertical Design Optimisation Techniques for Sites with Large Elevation Differences
Tao Wang, Jie Yang, Bo Yan, Dong Xiao Li, Zhixin Liu, Yi Tu, Wei Jiang
Key points
From the paper's conclusion- Therefore, it has achieved the goal of changing the traditional form of earthwork engineering based on empirical experience into a digital, high-precision and environmentally friendly one, and has also provided many practical cases for large-scale high-difference site construction projects.
Abstract
There are many problems in mountainous urban development, such as complex topography, significant errors in earthwork estimation, imbalance in excavation and backfilling volumes, suboptimal vertical layout, high transportation costs, etc. This paper will use all-round investigation methods on a real-world EPC school construction project and, with the help of digital technology, such as drone aerial surveying, BIM-GIS integrated modelling and intelligent algorithms, address these problems. A high-precision terrain acquisition system based on unmanned aerial vehicles has been built, zoned vertical design models have been established, refined earthwork calculation methods have been developed, a dynamic earthwork allocation system has been introduced, and coordinated elevation design for retaining walls and perimeter walls has been carried out to solve the technical problems of elevation optimisation in complex terrain, slope stability assurance and intelligent earthwork management. The whole technical system in this paper is to collect data, optimise the design according to this data, dynamically monitor the application of the results, and thus enhance the accuracy of earthwork estimation and improve the transportation efficiency and cost-effectiveness of retaining structures. Therefore, it has achieved the goal of changing the traditional form of earthwork engineering based on empirical experience into a digital, high-precision and environmentally friendly one, and has also provided many practical cases for large-scale high-difference site construction projects.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Factors Influencing Green Construction Costs of High-Speed Railways in Mountainous Areas Based on DEMATEL-ISMBuildings · 2026
- Physics-informed dictionary learning of time-varying 3D settlements from sparse monitoring data and 2D numerical models with consideration of complex stratigraphyGeoscience Frontiers · 2025
- Data-driven site demarcation using tailored lego clustering – size of siteComputers and Geotechnics · 2026
- Terrain-corrected differential GNSS gravity potential leveling method and its application to elevation determination in mountainous areasScientific Reports · 2026
- A Feature-Fusion Convolutional Neural Network for Terrain GeneralizationRemote Sensing · 2026
- Deterministic versus random finite element analysis of tunnel response: a case study in munich areaGeotechnical and Geological Engineering · 2025