Communications engineering
Dependable AI for electric power grid operation requires staged auditable deployment.
Ahmed S Musleh
School of Electrical Engineering and Telecommunications, University of New South Wales, Sydney, NSW, Australia. ahsmusleh@gmail.com.
Key points
From the paper's conclusion- Here, I argue that the adoption of AI as a reliable operator will require staged, auditable deployments that demonstrate safety in real‑world, multi‑actor environments.
Abstract
AI technology is evolving from simple grid‑forecasting tasks to complex decision‑making roles. Here, I argue that the adoption of AI as a reliable operator will require staged, auditable deployments that demonstrate safety in real‑world, multi‑actor environments.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Agentic Artificial Intelligence for Smart Grids: A Comprehensive Review of Autonomous, Safe, and Explainable Control FrameworksEnergies · 2026
- An Agentic Framework for Automated Power System Studies and Grid Connection AssessmentarXiv · 2026
- A Governance-Aware Large Language Model Orchestrated Agentic Digital Twin for Transmission System Operator Control Room Decision SupportarXiv · 2026
- Emerging AI for resilient smart-grid fault detection: an evidence-based capability synthesis, maturity assessment, and research roadmapJournal of Electrical Systems and Information Technology · 2026
- A systematic review of artificial intelligence driven energy management in smart gridsDiscover Artificial Intelligence · 2026
- Artificial intelligence for sustainable power systems applications challenges and future directionsDiscover Sustainability · 2026