Reliability improvement of distribution networks through optimal recloser placement considering photovoltaic resource allocation and sizing with protection coordination constraints
Mohammad Ebrahim Hajiabadi, Hossein Ramezani, Reza Tarsa, Hossein Lotfi, Majid Baghaei Nejad
Key points
From the paper's conclusion- The results demonstrate that the proposed framework can simultaneously optimize recloser placement and PV allocation while maintaining proper protection coordination and the fuse-saving strategy.
Abstract
This study presents an integrated optimization framework for the optimal placement of reclosers and the simultaneous determination of the location and capacity of photovoltaic (PV) units in distribution networks. Unlike conventional approaches that treat the placement of protection devices and PV allocation as separate planning problems, the proposed method addresses both problems simultaneously and evaluates the impact of PV integration on protection performance and network reliability. Within this framework, recloser placement aims to improve reliability indices, including SAIFI, SAIDI, and ENS, while the locations of PV units and the maximum hosting capacity are determined subject to network voltage constraints. In addition, the coordination constraint between the recloser and cut-out fuse is incorporated into the objective function as a penalty term to ensure proper protection coordination and maintain the fuse-saving strategy. The optimization problem is solved using a search algorithm, and the proposed method is evaluated on the IEEE 33-bus test system. In Scenario 2, Bus 29 is identified as the optimal location for a PV unit with a capacity equivalent to 70% of the total network load, resulting in an improved voltage profile. In Scenario 3, with the recloser optimally placed on Line 1, the ENS, SAIFI, and SAIDI values are 36.82 (MWh/yr), 5.58 (int/cus/yr) and 9.12 (h/cus/yr), respectively. Furthermore, the short-circuit analysis of faults downstream of the cut-out fuses confirms that the recloser–fuse coordination constraint is satisfied both with and without PV integration. The results demonstrate that the proposed framework can simultaneously optimize recloser placement and PV allocation while maintaining proper protection coordination and the fuse-saving strategy. It also enables an increase in PV hosting capacity subject to voltage constraints and improves network reliability.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Coordinated Optimization of Recloser Placement and Distributed Generation Considering Protection SensitivityElectronics · 2026
- Reliability-oriented optimal planning of photovoltaic distributed generation and energy storage in radial distribution networksResults in Engineering · 2026
- Coordinated Planning of Multiple DERs, Voltage Control Devices and Network Reconfiguration in a Real Multi-Feeder Distribution SystemElectricity · 2026
- Adaptive Overcurrent Protection of Distribution Substations with Definite-Time CharacteristicsEnergies · 2026
- Coordinated capacitor-SVG reactive power compensation configuration for substations with high-penetration distributed photovoltaic integrationJournal of Renewable and Sustainable Energy · 2026
- Research on assessment and adaptive correction technology of power system protection fixed value mismatch.Scientific reports · 2026