Journal of Plasma PhysicsOpen accessTokamak

Overview of the physics basis for the ARC fusion power plant

J. C. Hillesheim, A. J. Creely, Thomas H. Eich, Nathan T. Howard, N. Leuthold, Ryan Sweeney, Alexandra LeViness, Andrew O. Nelson,

Fusion Academy · Fusion (United States)

Review

Abstract

Commonwealth Fusion Systems plans to build ARC as the first fusion power plant at a site in Chesterfield County, Virginia, USA by the early 2030s. We present an overview of analysis comprising the physics basis of the ARC V3A design, a high-magnetic-field tokamak with $B_0=11.4 \ \text{T}$ , $I_p=12.0 \ \text{MA}$ , $R_0=4.62 \, \text{m}$ , $a=1.18 \, \text{m}$ . ARC V3A is designed to produce $P_{fus} \approx 1.13$ GW DT fusion power and deliver $\geqslant$ 400 MW net electric power to the grid. This overview includes quantitative analysis of fundamental issues for design of and operational plasma scenarios for a tokamak power plant, and lays out the design targets and strategic choices for ARC, including empirical fusion performance projections, assessment of H-mode access, ion cyclotron resonance heating simulations, alpha particle physics and time-dependent full-pulse simulations. This is complemented by topical papers on fusion performance and transport, disruption physics, boundary physics and magnetohydrodynamic stability. Critically, these studies identify key model uncertainties and physics risks to be retired through SPARC operation. Due to the modular nature of ARC, early results from SPARC can be incorporated into the design of the first ARC as well as subsequent replacements of the ARC vacuum vessel.

Read the paper

Discussion

Science Skim's AI key points, plus readers' public thoughts

Readers' thoughts

No reader thoughts yet.

Related papers

Overview of the physics basis for the ARC fusion power plant — Science Skim