EPS-associated particle-biofilm matrix development links sustained microplastic accumulation to high-load pore-space loss in constructed wetlands.
Cheng Shen, Lei Wang, Qun Wu, Yu Bon Man, Zhangbo Wu, Wenbin Liu, Bin Ji, Cheng Liu,
Zhejiang Province Key Laboratory of Recycling and Eco-Treatment of Waste Biomass, Zhejiang University of Science and Technology, Hangzhou, 310023, PR China. · Agricultural Industrialization Development Service Center of Tonglu County, 23rd Floor, State-owned Assets Building, Tonglu County, Hangzhou, 311500, PR China.
Key points
From the paper's conclusion- These results are consistent with EPS-associated particle-biofilm interactions and pore occupation, although endpoint associations cannot establish the causal order of particle retention, biofilm development and pore-space change.
Abstract
Constructed wetlands (CWs) can efficiently intercept microplastics (MPs), but this apparent removal transfers persistent particles from the water column into the wetland bed. Whether continuous MP accumulation translates directly into structural deterioration, and how biofilm extracellular polymeric substances (EPS) contribute to this process, remain poorly understood. Here, vertical-flow CWs containing sewage-sludge biochar (SB) or gravel were operated for approximately 800 d under polypropylene microplastic (PP-MP) concentrations of 0, 0.5, 5 and 50 mg L⁻¹. PP-MP removal exceeded 85% in all exposed systems, with higher monitored removal in SB than in gravel; particle concentrations at the two sampled intervals (0-5 and 10-15 cm) were similar. Within SB, PP-MP concentration explained a significant secondary component of bacterial-community variation (R² = 0.054, p = 0.001), while the community shift was strongly aligned with EPS variation. Upper-layer EPS increased from approximately 22.1 µg g⁻¹ in the unloaded SB control to 30.2 µg g⁻¹ at 50 mg L⁻¹ and covaried strongly with retained PP-MPs across treatments (R² = 0.78, p = 0.0037). Importantly, particle accumulation did not translate proportionally into pore-space loss. After adjustment for initial porosity, terminal SB porosity was lower than the unloaded SB control by 0.36, 0.62 and 2.33 percentage points at 0.5, 5 and 50 mg L⁻¹, respectively (Holm-adjusted p = 0.0095, 0.0011 and <0.0001), with terminal SB50 porosity reaching approximately 18.1%. These results are consistent with EPS-associated particle-biofilm interactions and pore occupation, although endpoint associations cannot establish the causal order of particle retention, biofilm development and pore-space change. The findings shift CW evaluation beyond effluent removal toward the long-term fate and structural consequences of retained particulate contaminants.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Biofilm growth is insufficient to retain large buoyant microplastics in constructed wetlandsJournal of Hazardous Materials · 2026
- Aging of Microplastics across a Constructed WetlandACS ES&T Water · 2025
- Wastewater Treatment Performance of Gravel, Graphite, and Biochar as Wetland Substrates in the Presence and Absence of Mixed MicroplasticsWater · 2026
- Polymer-specific stimulation of sulfide and methane production by microplastics in sewer biofilm.Environmental research · 2026
- Decoupling EPS functionality from quantity for sustained performance in solid biological treatment systems using biochar as a tuning agent.Bioresource technology · 2026
- From impact to restoration: Biodegradable polylactic acid microplastics in microalgal-bacterial granular sludge systemsProcess Safety and Environmental Protection · 2025