Journal of environmental management

Prioritising forest protection and restoration using alternative scenarios of intactness.

Joseph Kelly, Dylan Jefri Ong, Gopalasamy Reuben Clements, Rand Low, Michael Senescall, Yiwen Zeng, Sri Rao, Tajang Jinggut

Nature Based Solutions, Common Ground Jaya One, 46200, Petaling Jaya, Selangor, Malaysia; Old-Growth Labs, 82A James Carter Road, Mildenhall, Suffolk, IP28 7DE, United Kingdom. Electronic address: joe@oldgrowthlabs.com. · Nature Based Solutions, Common Ground Jaya One, 46200, Petaling Jaya, Selangor, Malaysia.

Computational

Key points

From the paper's conclusion
  • We demonstrate that alternative scenario predictions can support protected area delineation, restoration prioritisation, carbon accounting and annual monitoring, using a framework that can be transferred and refitted to other landscapes.

Abstract

Prioritising forested protected areas requires landscape-specific measures of relative intactness. Existing global intactness products rely on rule-based thresholds that may not be locally relevant, and can become obsolete in areas of rapid land-use change. We present a machine learning framework that predicts aboveground biomass density from spaceborne lidar footprints under actual and alternative scenarios, including counterfactual disturbance histories. Disturbance, restoration potential and a locally calibrated structural indicator of relative intactness can then be derived. Scenario features representing land cover and land use are modified, while static features such as topography are held constant. We provide a demonstration for the Taman Negara forest complex of Peninsular Malaysia, where outputs informed the delineation of Malaysia's first tiger reserve. Around 60% of the degradation shortfall relative to an old-growth baseline was not attributable to disturbance since 1996, the earliest satellite-derived baseline. Intact old-growth forest in Phase 1 (924 km2) of the new protected area was distinguished from disturbed forest with high restoration potential in Phase 2 (416 km2). An alternative road-construction scenario estimated that the gazettement of Phase 1 prevented the loss of 152,869 ± 10,342 tonnes of old-growth aboveground biomass. Annual scenarios found no evidence of anticipatory leakage within Phase 2, which is due to be protected by 2028. We demonstrate that alternative scenario predictions can support protected area delineation, restoration prioritisation, carbon accounting and annual monitoring, using a framework that can be transferred and refitted to other landscapes.

Read the paper

Discussion

Science Skim's AI key points, plus readers' public thoughts

Readers' thoughts

No reader thoughts yet.

Related papers

Prioritising forest protection and restoration using alternative scenarios of intactness — Science Skim