Certified supervisory recovery and scheduling for automated manufacturing systems under diagnosis delay.
Gang Chen, Peng Wei
Shien-Ming Wu School of Intelligent Engineering, South China University of Technology, Guangzhou, 511442, China. Electronic address: gangchen@scut.edu.cn. · Department of Mechanical and Aerospace Engineering, University of California, Davis, CA 95616, USA; Department of Bioproducts and Biosystems Engineering, University of Minnesota, St. Paul, MN 55455, USA.
Key points
From the paper's conclusion- Fault-tolerant operation of automated manufacturing systems becomes a coupled supervisory-recovery and scheduling problem when production decisions must be taken before diagnosis has uniquely resolved the failed component.
Abstract
Fault-tolerant operation of automated manufacturing systems becomes a coupled supervisory-recovery and scheduling problem when production decisions must be taken before diagnosis has uniquely resolved the failed component. An action that is admissible at the current state can alter which reconfigurations remain reachable after diagnosis, while a locally feasible reconfiguration can lose controllability, nonblockingness, observation consistency, or resource feasibility after plant-wide composition. This paper develops a game-contract-schedule framework for time-weighted discrete-event systems (DESs) that preserves admissibility across these changes in decision representation. A recoverability game first operates on support-hypothesis states and retains pre-diagnosis controls from which every observation-consistent fault hypothesis keeps access to an admissible recovery. Once diagnosis resolves the relevant fault, assume-guarantee contracts instantiate fault-partner options and certify their composition, with concrete recovered-plant verification used when interface abstraction cannot establish the required reflection properties. Event-operation closure then extracts the executable subset of the accepted recovered language, and partial-order scheduling provides optimal or bounded-suboptimal timing solutions within that certified subset. Computational studies isolate the corresponding failure modes, quantify loss of diagnosis-time recoverability and local-to-global incompatibility, and evaluate locality-dependent contract repair and executable-language-constrained scheduling.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Game Petri Nets: Compositional Modeling and Analysis of Large-Scale Strategic SystemsarXiv · 2026
- Synthesizing Update Schedules with Game-Based Extension of Bounded Model CheckingarXiv · 2026
- Dynamic Event-Triggered Control for Human–Machine Cooperative Systems Based on Dynamic Authority AllocationIEEE Transactions on Systems Man and Cybernetics Systems · 2026
- Repairing actuator schedules under graph constraintsarXiv · 2026
- DIGITAL-TWIN-EMBEDDED DEEP REINFORCEMENT LEARNING FOR ADAPTIVE SCHEDULING AND REPLANNING IN SMART MANUFACTURING UNDER COMPOUND DISTURBANCEInternational Journal of Progressive Research in Engineering Management and Science · 2026
- Structural Analysis of Hybrid-Trace Nets: An Optimization ApproacharXiv · 2026