Spatio-temporal optimisation of hydrogen supply chains in the United Kingdom: An RTN-based assessment of infrastructure, cost, and deployment pathways
Dauda Sh. Ibrahim, Nilay Shah
Imperial College London
Key points
From the paper's conclusion- A spatio-temporal optimisation framework using RTN is presented for designing a hydrogen supply chain in the UK, considering production, transport, storage, and end-use allocation.
- System cost is primarily driven by infrastructure topology, and cluster-based deployment strategies achieve lower levelised costs of hydrogen (LCOH) due to reduced transmission requirements.
- The study highlights the critical role of coordinated infrastructure planning, particularly pipelines and storage, in achieving cost-effective hydrogen deployment.
Abstract
This study presents a comprehensive spatio-temporal optimisation framework for the design of a hydrogen supply chain in the United Kingdom, integrating production, transport, storage, and end-use allocation within a unified Resource–Task Network (RTN) formulation. The model captures spatial heterogeneity across industrial clusters and renewable resource zones, alongside temporal variability in demand and renewable generation. A mixed-integer linear programming (MILP) approach is employed to simultaneously optimise infrastructure investments and operational strategies, considering both green hydrogen via electrolysis and blue hydrogen via auto-thermal reforming with carbon capture and storage. Eight deployment scenarios are analysed to evaluate alternative configurations of hydrogen demand, production mix, and storage capacity. Results demonstrate that system cost is primarily driven by infrastructure topology rather than production scale alone. Scenarios requiring extensive hydrogen and CO 2 transmission networks exhibit disproportionately higher capital expenditure, revealing nonlinear cost escalation with system expansion. Renewable-dominant configurations show strong sensitivity to electricity costs, while blue hydrogen systems are influenced by natural gas and carbon management requirements. Cluster-based deployment strategies with co-located production, storage, and demand achieve lower levelised costs of hydrogen (LCOH) due to reduced transmission requirements. The findings highlight the critical role of coordinated infrastructure planning, particularly pipelines and storage, in achieving cost-effective hydrogen deployment. The study provides policy-relevant insights supporting phased, cluster-first hydrogen rollout aligned with the UK's net-zero targets.
Read the paper
Discussion · 1
Science Skim's AI key points, plus readers' public thoughts
- A spatio-temporal optimisation framework using RTN is presented for designing a hydrogen supply chain in the UK, considering production, transport, storage, and end-use allocation.
- System cost is primarily driven by infrastructure topology, and cluster-based deployment strategies achieve lower levelised costs of hydrogen (LCOH) due to reduced transmission requirements.
- The study highlights the critical role of coordinated infrastructure planning, particularly pipelines and storage, in achieving cost-effective hydrogen deployment.
Readers' thoughts
No reader thoughts yet.
Related papers
- Optimizing hydrogen supply chain networks for climate change mitigation: a multi-objective MILP framework with carbon pricing and geographic advantagesFrontiers in Environmental Science · 2026
- Hydrogen valleys to foster local decarbonisation targets: a multiobjective optimisation approach for energy planningApplied Energy · 2025
- Integrated hydrogen system analysis across the resource-environment-economy nexus: a case study of ChinaJournal of Industrial Ecology · 2026
- Cross-regional optimization of electricity-hydrogen dispatching considering multi-type hydrogen storage and transportationJournal of Renewable and Sustainable Energy · 2026
- Optimizing hydrogen supply chains for energy-intensive industries: A cost-efficient frameworkInternational Journal of Hydrogen Energy · 2026
- Addressing Spatiotemporal Mismatch via Hourly Pipeline Scheduling: Regional Hydrogen Energy Supply OptimizationEnergies · 2025