Federica Restelli, Fuyu Jiao, Bruce W. E. Norris, J. P. Martin Trusler, Arman Siahvashi, Eric F. May, Laura A. Pellegrini, Michael L. Johns, Saif Z.S. Al Ghafri
At prospective liquid hydrogen (LH 2 ) export terminals, managing boil-off gas (BOG) presents a significant challenge that has not been adequately explored in the literature. This work is a case study examining the management of BOG evolved during storage and carrier loading at an export terminal, carried out using detailed dynamic simulations. The considered terminal operates with a LH 2 production rate of 450 t/d, and a carrier capacity of 160000 m 3 . The normal operation cycle spans a period of 28 days, during which all the generated BOG is recovered. The estimated levelized cost for terminal storage and shipment is 2.77 USD/kg, underlining the need for further research to reduce costs and enhance the economic viability of LH 2 export. A sensitivity analysis indicates that the production rate primarily affects the duration of the normal operation cycle and, consequently, shipping frequency, while feed pressure and ortho-para hydrogen composition significantly influence total BOG generation.