Key points
From the paper's conclusion- We recommend field-scale implementation with 24-day HRT using planted pumice beds, alongside long-term performance monitoring under varying influent loads to optimize design parameters for healthcare facilities.
Abstract
Due to persistent contaminants in healthcare wastewater (HWW), conventional treatment technologies are ineffective. Yet few studies utilize local materials, and none have compared pumice versus ignimbrite substrates with Cyperus alternifolius in horizontal subsurface flow constructed wetlands (HSSFCWs). Four pilot-scale systems (2.8 m × 0.8 m × 0.6 m) with volcanic substrates (ignimbrite and pumice), with and without Cyperus alternifolius , were established. The constructed wetland units operated at a loading rate of 0.01125 m 3 /day. Chemical oxygen demand (COD), total suspended solids (TSS), turbidity, nitrate (NO₃⁻), and phosphate (PO₄³⁻) were measured using standard methods at hydraulic retention times (HRTs) of 4, 8, 12, and 24 days. Data were analyzed using two-way ANOVA with Tukey’s post-hoc test (α = 0.05). At a 24-day HRT, the planted pumice bed (W4) achieved promising removal results for COD, TSS, turbidity, NO₃⁻, and PO₄³⁻ 98.6%, 98.3%, 96.2%, 99.8%, and 97.9%, respectively. Whereas the planted ignimbrite (W2) system also performed well: 95.8% for COD, 96.9% for TSS, 91.8% for turbidity, 96.3% for NO₃⁻, and 94.2% for PO₄³⁻. The effects of HRT and wetland type were statistically significant ( p < 0.0001). The comparison between wetland units was also tested using Tukey’s test: W4 statistically enhanced removal compared with W2 ( p < 0.0112) and the unplanted units ( p < 0.05). Overall, the planted pumice bed system provides better removal efficacy. This low-cost, nature-based solution demonstrates significant potential for sustainable HWW treatment in resource-limited settings. We recommend field-scale implementation with 24-day HRT using planted pumice beds, alongside long-term performance monitoring under varying influent loads to optimize design parameters for healthcare facilities.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Pilot-Scale Comparison of Pollutant Removal by Integrated Vertical-Flow Constructed Wetlands Treating Synthetic Low-C/N Rural Domestic Wastewater Under Different Operating ConditionsWater · 2026
- Quantitative effects of substrate, vegetation, and hydraulic loading on pollutant removal in constructed wetlandsEcological Engineering · 2025
- Constructed wetlands as a sustainable solution for domestic wastewater treatment in EgyptJournal of environmental chemical engineering · 2026
- Two-year field performance of a full-scale ornamental constructed wetland treating university wastewater under tropical operating variabilityJournal of Ecological Engineering · 2026
- Complementary removal of municipal pollutants via biochar-amended wetlands planted with Lemna minor and Arundo donaxInternational Journal of Phytoremediation · 2026
- Comparative study of Acorus calamus and Cyperus alternifolius in rice husk biochar integrated constructed wetland systems for nitrogen removalApplied Water Science · 2025