科研速览 · Science Skim继续刷下去 · Keep skimming →
◆ International Journal of Coal Science & Technology2026-04-10· Overburden

Development of the water-conducting fracture zone in longwall top-coal caving mining with super-large mining height and weak cemented overburden

Cun Zhang, Juhao Cheng, Jun He, Yongqi Lian, Qingsheng Bai, Zhiwen Da, Yi Wang

原始摘要(英文原文)· Original abstract
Abstract This study investigates the height evolution of the water-conducting fracture zone (WCFZ) under super-high mining conditions in the 1101 longwall face of Zhundong No. 2 Mine. Based on 28 measured datasets, a multivariate nonlinear regression model is proposed, outperforming traditional empirical formulas in accuracy. Numerical simulations reveal four developmental stages of the WCFZ: initial acceleration (0–180 m), deceleration (180–270 m), renewed acceleration (270–420 m), and stabilization (≥ 420 m). Morphologically, the WCFZ transforms from arch-shaped to trapezoidal and ultimately to a flattened arch. Three-dimensional simulations show synchronized evolution between the plastic zone and the WCFZ. Field validation is achieved through microseismic monitoring and borehole leakage data. A critical mining height of 16 m is identified, beyond which WCFZ growth shifts from linear (11.38 m/unit) to nonlinear (19.45 m/unit), causing destabilization of the beam-arch structure and promoting vertical fractures. Fracture patterns vary by lithology: weakly consolidated strata form mesh-like networks, while cemented layers exhibit stepwise, slip-induced fractures. This study offers an accurate prediction model and insights into WCFZ mechanics for improved mining safety and groundwater protection.
读原文 · Read the paper ↗

AI 追问PRO

登录后使用 AI 追问

讨论区

登录后参与讨论

相关论文 · Related

Development of the water-conducting fracture zone in longwall top-coal caving mining with super-large mining height and weak cemented overburden — 科研速览 Science Skim