Assessing drought vulnerability and water allocation in a monsoonal river basin using integrated modeling.
Vuong Nguyen Dinh, Phong Nguyen Thanh, Thinh Le Van, Nu Ngoc Tran, Duong Tran Anh, Le Ngoc Anh, Pham Thi Huong
Southern Institute of Water Resources Research, Ho Chi Minh City, Vietnam. · Laboratory of Environmental Sciences and Climate Change, Institute for Computational Science and Artificial Intelligence, Van Lang University, Ho Chi Minh City, Vietnam. phong.nguyenthanh@vlu.edu.vn.
Key points
From the paper's conclusion- Across the 23 sub-basins, drought severity and spatial extent varied with hydrological conditions and with differences in reservoir operation, local demand, and infrastructure.
Abstract
In monsoonal river basins, seasonal drought risk depends on the timing of runoff, infrastructure operation, and competing sectoral demands as well as on annual water availability. Earlier provincial applications of related models did not represent the full Ba cascade-irrigation-coastal allocation network or combine projected industrial-demand growth with hectare-scale drought-hotspot mapping. A sequential coupling of the MIKE NAM rainfall-runoff model with MIKE HYDRO Basin across 23 sub-basins represents reservoir operation, environmental-flow requirements, sectoral priorities, and infrastructure connectivity. Simulations compared the 2017 baseline scenario (SC1) with a 2030 planning scenario based on Representative Concentration Pathway 4.5 (RCP4.5; SC2) under four inflow exceedance probabilities (PoE = 25%, 50%, 75%, and 90%). Approximately 68.0% of modeled annual inflow occurred during September-December, whereas irrigation demand was concentrated during the following eight-month dry season. Operational verification of reservoir storage produced correlation coefficients of 0.9944 and 0.9939 and Nash-Sutcliffe efficiency values of 0.9599 and 0.9632 for the Winter-Spring and Summer-Autumn seasons, respectively. Under SC2, total annual water demand increased by 17.04%, and industrial demand increased nearly twentyfold relative to SC1. The Upper Dong Cam annual deficit increased from 37.63 to 55.79 × 106 m3, while the province-wide area affected by extreme drought at PoE = 90% increased from 4016.4 to 6300 ha. Regulated sub-basins retained greater dry-season supply reliability, whereas isolated coastal sub-basins and small storage systems showed the greatest modeled vulnerability. Across the 23 sub-basins, drought severity and spatial extent varied with hydrological conditions and with differences in reservoir operation, local demand, and infrastructure.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Multi-Source Joint Water Allocation and Route Interconnection Under Low-Flow Conditions: An IMWA-IRRS Framework for the Yellow River Water Supply Region Within Water Network LayoutSustainability · 2026
- Optimal Trade-Off of Dynamic Water Resources Spatio-Temporal Allocation Considering Seasonal Variations: A Multi-Stage Multi-Objective Programming with Hybrid Uncertainty and Risk PreferenceWater · 2026
- Future Effective Runoff Under CMIP6 Scenarios in a Data-Scarce Monsoon Basin: A Regionalized SCS-CN ApproachHydrology · 2026
- Dynamic Water Budget Modeling to Fill Knowledge Gaps and Improve Water Management in Arid and Semi‐Arid RegionsHydrological Processes · 2026
- Structural vulnerability regimes of water supply systems under climate change: A robustness-based analysis using multi-dimensional sustainability indicators.Journal of environmental management · 2026
- Estimation of hydrological drought using regional risk ranking and machine learning algorithmsScientific Reports · 2026