A decision-support model for EOL test industrialization during ECU production ramp-up
Matyáš Horák
Key points
From the paper's conclusion- In manufacturing test systems, this transition is particularly critical because starting industrialized end-of-line (EOL) testing too early increases rework under unstable product definitions, whereas starting too late can constrain ramp-up readiness and increase post-SOP support effort.
Abstract
Production ramp-up requires timely decisions on when flexible engineering resources should be replaced or complemented by production-intent processes. In manufacturing test systems, this transition is particularly critical because starting industrialized end-of-line (EOL) testing too early increases rework under unstable product definitions, whereas starting too late can constrain ramp-up readiness and increase post-SOP support effort. This paper presents an integrated decision-support formulation for comparing candidate start times for the transition from flexible test-bench (TB) testing to EOL test-process industrialization. The model links time-dependent functional-test demand, project-level software maturity/release-stage changes, latent EOL readiness, manual TB capacity, a pre-SOP readiness gate, and normalized cost; project phases are used only to parameterize and label the industrial case study. The formulation is evaluated retrospectively using anonymized weekly data from two electronic control unit programs. Among four pre-defined phase-aligned planning benchmarks, the mid-C1 benchmark has the lowest baseline penalized normalized cost. A complementary weekly start-time scan identifies project week 59, still within C1, as the baseline model minimum while satisfying the readiness requirement at the gate. Sensitivity and switching-point analyses show that the preferred phase-aligned benchmark changes toward C2 when readiness develops sufficiently faster, the required readiness is reduced, or the late-readiness penalty is weakened. The study therefore supports a conditional timing trade-off between release-driven EOL rework, manual TB resource pressure, and late-readiness risk rather than a universal phase prescription or an independently validated predictive optimum.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Is the Juice Worth the Squeeze? Cost–Value Trade-offs in Engineering Review ProcessesJournal of Physics: Conference Series · 2026
- Adaptive and Explainable Decision Support for Resilient Industrial Rail Operations: A Human-Centric DMAIC–Machine Learning FrameworkApplied System Innovation · 2026
- Adapting sales and operations planning to engineer-to-order complexity: a multifaceted information processing approach to managing uncertainty and equivocalityInternational Journal of Production Economics · 2026
- B-038 Design and standardization of automated pre-analytical and post-analytical workflows to support growth in a high-volume clinical laboratoryClinical Chemistry · 2026
- Overall Equipment Effectiveness as a Strategic KPI in Intelligent Manufacturing: A Case Study in Plastic Injection MouldingJournal of Manufacturing and Materials Processing · 2026
- Stage-Wise Threshold Calibration for Early Defect Warning in Multi-Stage Manufacturing: A Cost-Sensitive Single-Line Automotive Case StudyMachine Learning and Knowledge Extraction · 2026