A Hopfield neural network-based approach for parallel additive machine scheduling problems with due dates
Benedikt Zipfel, Oğuzhan Ahmet Arık, Udo Buscher
Key points
From the paper's conclusion- We propose a constructive heuristic that accounts for problem-specific characteristics such as due dates, earliness/tardiness penalties, and machine batch availability.
Abstract
In this study, we investigate a parallel additive manufacturing batch scheduling problem with unrelated parallel machines operating under powder bed fusion technology. The objective is to minimize the makespan and the total weighted earliness and tardiness. We propose a constructive heuristic that accounts for problem-specific characteristics such as due dates, earliness/tardiness penalties, and machine batch availability. To further enhance solution quality, we develop a Hopfield neural network (HNN)-based improvement scheme specifically tailored to this problem. The performance of the proposed approach is evaluated against an integrated mixed integer linear programming formulation, as well as a Genetic Algorithm (GA). Computational experiments based on adapted benchmark instances demonstrate that the HNN-based solution approach outperforms the solver and the GA on larger instances with limited machines, while it remains competitive with the GA for smaller instances.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- EGD–ILS: Hybrid Penalty–Energy Gradient Descent Optimization for Job Shop SchedulingMathematics · 2026
- GA-HPO PPO: A Hybrid Algorithm for Dynamic Flexible Job Shop SchedulingSensors · 2025
- A neural-driven constructive heuristic for the flexible job shop scheduling problem: An efficient alternative to complex deep learning methodsComputers & Operations Research · 2026
- Health-Aware Multi-Objective Flexible Job Shop Scheduling with Machine Health Heterogeneity and Load-Induced DegradationMathematics · 2026
- Solving Multi-Objective Flexible Job Shop Scheduling Problem to Achieve Sustainable ManufacturingSustainability · 2026
- Higher-order neuromorphic Ising machines—autoencoders and Fowler-Nordheim annealers are all you need for scalabilityNature Communications · 2026