Optimizing Dissolved Oxygen and Sludge Retention Time via ASM1 Simulation for Energy and Emission Reduction in Tropical Multi-Industrial WWTPs Toward Net Zero.
Vinh Thi Nguyen, Trung Minh Dao, Thang Anh Nguyen, Anh Hung Le
Institute for Environmental Science, Engineering, and Management, Industrial University of Ho-Chi-Minh City, Ho Chi Minh City, Vietnam. · Aquadata Abwassertechnik GmbH, Spatzenstieg 1A, Brunswick, Germany.
Key points
From the paper's conclusion- Therefore, P2 (DO = 2.0 mg/L; SRT = 7 days) is recommended for full‐scale implementation at the plant.
Abstract
Energy optimization in multi-industrial wastewater treatment plants (WWTPs) located in tropica regions remains challenging due to highly fluctuating loading conditions and the lack of long-term operational datasets. This study employed a 365-day dataset (156 samples) to calibrate (270 days, 116 samples) and validate (95 days, 40 samples) Activated Sludge Model No. 1 (ASM1) using SUMO 24 software for energy optimization at an industrial park WWTP in northern Ho Chi Minh City, Vietnam. The study aimed to support energy optimization and emission reduction strategies toward the Net Zero 2050 target. The calibrated model demonstrated good predictive performance for TCOD, TSS, TN, and NH4 +-N (R2 = 0.75-0.92; NSE = 0.50-0.88; MAPE = 15.2%-25.1%). Energy auditing revealed that the biological treatment system accounted for 50.6% of total electricity consumption, with aeration alone contributing 37.2%. A total of 35 simulation scenarios based on the DO × SRT matrix (DO: 1.5-4.5 mg/L; SRT: 3-7 days) identified the optimal operating region at DO = 1.5-2.5 mg/L combined with SRT = 5-7 days. A three-phase pilot study was subsequently implemented: Phase 1 (P1) increased SRT (5 → 7 days), which stabilized nitrification and expanded the TN safety margin from 3.9% to 7.5%; Phase 2 (P2) reduced DO (3.0 → 2.0 mg/L), resulting in a 17.66% reduction in energy consumption (34,831 kWh/year; 76.63 million VND/year) and a decrease of 21.72 tCO2e/year in emissions while maintaining a TN safety margin of +14.8%; and Phase 3 (P3) (DO 2.0 → 1.5 mg/L) was rejected because it caused nitrification instability, reduced the TN safety margin to 6.7%, and increased the sludge volume index (SVI) beyond 120 mL/g. Therefore, P2 (DO = 2.0 mg/L; SRT = 7 days) is recommended for full-scale implementation at the plant. The proposed framework integrating ASM1 simulation, energy auditing, emission assessment, pilot validation, and a Net Zero roadmap demonstrates strong scalability for similar industrial WWTPs across Southeast Asia.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Modeling and optimization of siphon downflow hanging sponge reactor using ASM1 for enhanced nutrient removal in municipal wastewater treatment.Journal of environmental management · 2026
- An Integrated Explainable COD and BOD Predictive Modeling Framework for Oxygen Uptake Rate Estimation and Feedforward PI Aeration Control in Municipal Wastewater Treatment PlantsElectronics · 2026
- Performance analysis of an air-source heat pump for low-temperature sludge drying in a water treatment plantCleaner Waste Systems · 2026
- Performance Evaluation of Domestic Wastewater Treatment Using SBR With Air Recirculation and Optimize Its Performance by Machine Learning Approach.Water environment research : a research publication of the Water Environment Federation · 2026
- Multi-pollutant prediction and process parameter optimization of a wastewater treatment plant based on machine learning modelsFrontiers in Water · 2026
- Carbon setpoint regulation enables stable endogenous denitrification in an adaptive activated sludge system under low C/N and low-temperature conditions.Water research · 2026