Low‐settlement construction of crossings through embankments
Thomas Attwenger, Marcus Scheuerer
Key points
From the paper's conclusion- This approach makes it possible to construct a crossing with minimal impact on the embankment body (minimal settlement of the crest) with minimal or no disruption of the underpassed line (e.g., slow‐speed zones).
Abstract
Adapting existing assets will pose an increasingly significant challenge in the future in order to ensure sustainable operation, long‐term maintenance, and the necessary expansion or adaptation of the infrastructure to new requirements and conditions. In the case of transportation routes, their availability must be taken into account above all, which for rail routes often represents one of the decisive constraints due to a lack of detour options. In addition to construction activities along open stretches or in tunnel and cutting areas, embankment structures and fill sections are often part of maintenance projects. Among other things, it is often necessary here to integrate crossings into embankment structures, for example, to reduce above‐ground crossings or to replace existing crossings with new structures. In addition to traditional methods involving the excavation of a construction pit and the erection of the structure followed by backfilling, trenchless pipeline construction methods can be used here. The article focuses on the jacking method. In this process, culvert sections prefabricated outside the dam are pressed into the dam body using jacking equipment, and the resulting spoil is simultaneously removed from inside the culvert section. This approach makes it possible to construct a crossing with minimal impact on the embankment body (minimal settlement of the crest) with minimal or no disruption of the underpassed line (e.g., slow‐speed zones).
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Longitudinal Response of Existing Tunnels to Shield Undercrossing: Effects of Non-Uniform Excavation-Face Contraction and Local Subgrade Stiffness DegradationBuildings · 2026
- Investigation of construction settlement for super-long bidirectional circular pipe jacking - launching shaft structureJournal of Engineering and Applied Science · 2026
- Numerical Analysis of the Performance of a Hybrid Anchorage Foundation for Long-Span Suspension BridgesApplied Sciences · 2026
- Dynamics of Railway Culverts and Transition Zones Under Moving Trains: A Literature ReviewSymmetry · 2026
- Decomposition method for existing tunnel lining displacement induced by undercrossing: a case studyJournal of Zhejiang University. Science A · 2026
- Effects of Strain Softening and Strain Rate on Penetration of Stiffened Suction Caisson into Nonhomogeneous ClayJournal of Marine Science and Engineering · 2026