Advanced utilisation of monitoring data to cope with extreme squeezing conditions in the Karavanke tunnel
Jure Klopčič, Marko Žibert, Žan Turnšek
Key points
From the paper's conclusion- In response to the severe difficulties encountered in the Western tube, a comprehensive monitoring programme was implemented to manage the extremely squeezing ground conditions anticipated during construction of the Eastern tube.
Abstract
The Karavanke tunnel is an 8 km long twin tube double lane motorway tunnel connecting Slovenia and Austria through the Karavanke massif with overburden up to 1100 m. On the 3.5 km long Slovenian side, the tunnel passes through very diverse ground conditions, considering a 1 km long section in soft and highly deformable Permo‐Carboniferous (PC) claystones, siltstones and sandstones under high overburden as the major challenge. Construction of both tunnel tubes in the PC formation, the Western tube in 1980s and the Eastern tube recently, was characterised by large displacements of up to 1.6 m in two major fault zones and heavy damage of the primary lining, requiring an extensive remediation of the initially installed lining, sometimes even several times. In response to the severe difficulties encountered in the Western tube, a comprehensive monitoring programme was implemented to manage the extremely squeezing ground conditions anticipated during construction of the Eastern tube. This article presents advanced analyses and the application of monitoring data collected during construction, which enabled the development and implementation of innovative tunnel support strategies under conditions of extreme deformation. Post‐construction analyses are also discussed, providing further insight into the mechanisms governing the observed ground behaviour and contributing to an improved understanding of the underlying phenomena.
Read the paper
Discussion
Science Skim's AI key points, plus readers' public thoughts
Readers' thoughts
No reader thoughts yet.
Related papers
- Multi-Source Evidence Chain Identification and Mechanistic Analysis of a Creep-Type Expressway Embankment Landslide in a Mountainous Karst Area: A Case Study of the K610 Section of the Rucheng-Chenzhou Expressway.Sensors (Basel, Switzerland) · 2026
- Case study on pressure filled karst cave detection, tunnel construction simulation, and disaster risk assessment in karst development areasScientific Reports · 2026
- Integrated Hydrogeological Assessment of Underground Constructions in Swelling-Prone Keuper Lithologies: Insights from the Markusberg Tunnel (Luxembourg)Rock Mechanics and Rock Engineering · 2026
- The Evolution of External Water Pressure in Karst Tunnels Under Blockage of a New-Type Drainage SystemApplied Sciences · 2026
- Instability Characteristics and Active Control of Jointed Surrounding Rock in Super-Large-Span Shallow-Buried TunnelsEngineering Research Express · 2026
- Field evaluation and construction-process optimization of prestressed anchor cables in a squeezing soft rock tunnelEngineering Research Express · 2026